- Rockhill Restoration Session Agenda - July 22-23, 2017.
Friends of the East Broad Top
A nonprofit society dedicated to the preservation and restoration
of the East Broad Top Railroad National Historic Landmark
Things we do

Rockhill Restoration Session July 22-23, 2017.

Track Work
The track crew spends a November work session day rebuilding the paint shop lead/turntable escape track.
Steve Jacobs photo

The next FEBT Rockhill work session will take place Saturday and Sunday, July 22-23, 2017. We will work our usual daylight savings hours of 9 am to 5 pm Saturday and 9 am to 5 pm Sunday.

Weather

Keep your own eye on the weather by visiting accuweather.com and checking the Rockhill zip code, 17249.

Storm Damage

On the evening of July 7, prolonged rain caused a large tree at the foot of the Markle House hill to topple onto a power line that runs along the west (non-EBT) side of Jordan Run. This in turn caused a utility pole to fall and to interrupt service to the Paint Shop and most of the rest of the EBT yard.

Last week, FEBT member and professional electrician Charlie Wootton repaired the damage to the electrical service entering the Paint Shop, which was caused by the stress on the wire from the falling power pole. The local electric utility is projecting Wednesday or Thursday of this week to replace the utility pole and reconnect us.

The steel and combine crews will have some clean-up of storm debris to do on our side of Jordan Run as a kickoff to the session.

Power for the freight house project is available.

Meals

Local restaurants are available in Orbisonia.

Boilerhouse Rats

The Rats will get the freight house rigged for jacking, and hopefully get a bit of lift on it. If weather and turn-out permit, they may also finish the primer red paint on the foundry. Jim Bacon will lead this project.

Combine 14

Assuming the electricity is back on, the combine crew will continue with removing old paint from the inside of the car, fabricating sheathing for the upper body and clerestory, and installing the rubber roofing. Work will also continue on the baggage door posts. We will also be painting clerestory sash and sheathing preparatory to installation. Lee Rainey will lead this project.

Combine #16 trucks work
From the top of the sand house we see a lone FEBT volunteer working on the rider boxcar in front of the paint shop.
Dave Dietz photo

Steel Crew

This crew will be working on the box car, passenger trucks, and, if time and people are available, on the lumber shed. Steve Jacobs leads the Steel Crew.

Locomotive Shop

Repairs will continue at the south end of the locomotive shop. Bill Adams leads this work.

Ground Rules

To take part you must be 18 and a member of the FEBT (or join the FEBT at the work site.) These are insurance requirements. We are guests of the railroad and need to behave accordingly.

Last-minute walk-ons are always welcome at our sessions, but if possible, drop me an e-mail in advance to let me know that you are coming. It helps with the planning.

See you there!
Lee

 

FEBT Rockhill Work Crew Coordinator
R. Lee Rainey
784 Tanager Drive
State College, PA 16803-2502
Telephone: (814) 867–7878 (evenings)
E-mail: leerainey@aol.com



Copyright © 1999-2017 Friends of the East Broad Top, Inc. All rights reserved
EBT Train
Back to the FEBT Homepage